Article 1301 Zoning Permits Required
No building or other structure shall be erected, moved, added to, structurally altered, nor shall any building, structure, or land be established or changed in use without a permit therefore, issued by the Zoning Administrator. A permit will not be issued by the Zoning Administrator that does not conform with the provisions of this Resolution unless he receives a written order from the Board of Zoning Appeals deciding an appeal or permitting a conditional use or variance, as provided this Resolution.
zoning permit fees
New Homes
Accessory Buildings Ponds Swimming Pools Driveway Permit Conditional Use Permit Annual Renewal of Conditional Use Permit Appeals Board Variance Referendum Filing Fee Cell Tower Permit All Other Permits Non compliance/Late Permits (that have been started for more than 24 hours) |
.25 per square foot
.20 per square foot $75.00 $60.00 $100 for new dwelling including a green address sign $200.00 (new) $50.00 $125.00 $50.00 $5000.00 $60.00 $200 |